伊人久久艹-伊人久操-伊人精品综合-伊人精品网-伊人精品国产-伊人激情综合网

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 99久久这里只有精品 | 国产网站免费观看 | 亚洲精品www久久久久久久软件 | 成人在线一区二区三区 | 国产玖玖在线 | chinses台湾男同志hd | 国产卡一卡二卡四卡无卡 | 国产成人小视频在线观看 | 爽好舒服宝贝添奶吻戏 | 亚洲成年| 亚洲国产成人精品不卡青青草原 | 女教师系列三上悠亚在线观看 | 国产精品久久久久久影院 | а天堂中文最新版在线 | 555www成人网 | 污文啊好棒棒啊好了 | 34看网片午夜理 | 女教师被女同学调教成脚奴 | 久久久久免费视频 | 人与动人物性行为zozo共患病 | 国产肥老上视频 | 99久久精品自在自看国产 | 午夜神器18以下不能进免费 | 亚洲国产一区二区a毛片 | 四虎国产精品免费久久麻豆 | 91制片厂官网 | 欧亚精品一区二区三区 | 亚洲一成人毛片 | 嫩草影院久久99 | 精品无人乱码一区二区三区 | 5g影院成人| 亚洲日本中文字幕天天更新 | 911香蕉视频 | 波多野结衣久久国产精品 | 激情影院网站 | 无人区在线观看免费观看 | 成人国产在线播放 | 久久国产视频网 | 免费观看国产精品 | 麻生希在线 | 4虎影视国产在线观看精品 4s4s4s4s色大众影视 |